Skip to main content
Kitchen Remodeling West Palm Beach — A division of Pillar 22 Kitchen Remodeling West Palm Beach A division of Pillar 22 · CBC1268572 / CCC1337493

A division of Pillar 22 · CBC1268572 / CCC1337493

Kitchen Cabinet Refacing in West Palm Beach, FL

Transform the look of structurally sound West Palm Beach kitchens in 3–5 days with new custom doors, drawer fronts, matching wood or RTF veneers, and soft-close coastal hardware.

Typical investment: $6,500–$14,000

  • ✓ Licensed FL Contractor (CBC1268572 & CCC1337493)
  • ✓ Mon–Fri 8am–5pm, Sat 9am–12pm
  • ✓ Written, Itemized Proposals
Refaced kitchen cabinetry with warm modern doors, updated pulls, and clean stone surfaces
Photo by Clay Banks on Unsplash

Not every outdated kitchen in West Palm Beach needs a full gut demolition. Across Wellington, Royal Palm Beach, Boynton Beach, and Downtown West Palm Beach condos, thousands of homes have well-laid-out kitchens from the late 1990s and 2000s whose cabinet frames are completely solid—yet the honey-oak arches, dated raised panels, or peeling laminate doors make the entire room feel tired.

As the kitchen division of Pillar 22 (Florida licenses CBC1268572 and CCC1337493), we offer honest, craft-grade kitchen cabinet refacing as a streamlined alternative when full replacement isn’t necessary—and we tell you upfront if hidden moisture damage makes replacement the smarter investment.

What Our Cabinet Refacing Process Includes

True cabinet refacing is far more durable than quick cabinet painting. Instead of brushing paint over old, porous wood grain or worn laminate that chips within two years of humid Florida summers, we replace every visible door, drawer front, hinge, and exterior surface:

  1. Honest Box Inspection First: Before recommending refacing, we check under your kitchen sink, behind the dishwasher, and along toe kicks for swelling, delamination, or soft wood. If only the sink cabinet is damaged, we can rebuild that single box in marine-grade plywood and reface the rest.
  2. Surface Prep & Veneering: Existing doors and drawer fronts are removed. Face frames, stiles, rails, and exposed cabinet sides are scuffed, cleaned, and laminated with matching real hardwood veneer or heavy-duty rigid thermofoil (RTF) bonded with moisture-resistant adhesive.
  3. Custom-Milled Doors & Drawer Fronts: We install brand-new Shaker, flat-panel, or transitional doors precision-sized to your openings, finished in factory-cured conversion varnish or coastal-grade RTF.
  4. Hardware & Storage Upgrades: Old noisy hinges and side-mount tracks are swapped for concealed, soft-close European hinges and optional full-extension dovetail drawer boxes, pull-out trash bins, and spice organizers.
  5. Finishing Trim: Matching crown molding, light rail, and new pulls or knobs tie the kitchen together cleanly.

Why Refacing Makes Sense in Palm Beach County Condos & Seasonal Homes

In Downtown West Palm Beach, Palm Beach, and coastal Boynton Beach condominiums, a full gut remodel can trigger months of architectural board reviews, freight-elevator deposits, and noise-hour restrictions. Because cabinet refacing keeps your existing footprint, plumbing, and electrical in place, it typically avoids structural permits and wraps up on site in 3 to 5 days instead of 8 weeks.

For seasonal residents and busy families who want a bright, updated coastal kitchen without living through weeks of dust containment and a disconnected sink, refacing delivers dramatic visual impact with minimal disruption.

Material Choices for Coastal Humidity

Humidity in South Florida punishes shortcuts. That is why we steer homeowners away from thin peel-and-stick veneers and site-sprayed latex coatings. Our preferred refacing specifications include:

  • Painted HDF / Maple Shaker Doors: High-density fiberboard center panels resist seasonal expansion and hairline joint cracking better than solid maple center panels in air-conditioned-to-humid transitions.
  • 3D Laminate / Coastal Rigid Thermofoil (RTF): Seamless thermo-wrapped doors with zero open edge seams—easy to wipe down and highly resistant to steam near dishwashers and coffee makers.
  • Salt-Air-Resistant Hardware: Coated steel and stainless fasteners keep hinges smooth without rust spotting in ocean-breeze neighborhoods.

Typical Timeline & Pricing

Refacing ScopeTypical Cost RangeOn-Site Duration
Standard Door, Drawer Front & Veneer Reface$6,500–$9,5003–4 days
Reface + New Dovetail Drawer Boxes & Pull-Outs$9,500–$12,5004–5 days
Reface + New Sink Base Box / Island Modification$11,000–$14,000+5 days

Door fabrication takes roughly 3 to 5 weeks after measurement. Once everything arrives, your kitchen stays functional every evening while we work.

Comparing your options? Read our cabinet refacing vs. replacement cost guide, or pair refacing with countertop replacement and backsplash installation for a complete refresh.

Refaced kitchen cabinetry with warm modern doors, updated pulls, and clean stone surfaces
Photo by Clay Banks on Unsplash

Good to know

Cabinet Refacing — FAQs

Still have questions about permits, materials, or scheduling? Call our West Palm Beach team.

(561) 861-2222
How do I know if my West Palm Beach kitchen is a good candidate for refacing?
Refacing works best when your current layout functions well and the existing cabinet boxes—especially the sink base and dishwasher end panels—are dry, square, and structurally sound. If particleboard boxes have swelled from past humidity or plumbing leaks, we recommend targeted box replacement or full new cabinetry.
How much does cabinet refacing cost compared to new cabinets?
Most cabinet refacing projects in Palm Beach County run $6,500 to $14,000 depending on kitchen size, door material, and whether drawer boxes are upgraded. That typically saves 35% to 50% compared to tearing out and replacing everything with comparable semi-custom plywood cabinets.
How long does cabinet refacing take?
After custom doors and drawer fronts are measured and fabricated (about 3 to 5 weeks), on-site refacing installation takes just 3 to 5 days. Your sink, range, and refrigerator remain usable most of the week.
Do refaced cabinets hold up in South Florida’s humid climate?
Yes—when done with the right materials. We use moisture-resistant adhesives, edge-sealed painted HDF or conversion-varnish hardwood doors, and stainless or coated soft-close hinges. We will not veneer over swollen or mold-damaged particleboard.
Can I add new drawers, trash pull-outs, or replace countertops during refacing?
Yes. Many homeowners pair cabinet refacing with new dovetail drawer boxes, pull-out pantry trays, under-cabinet LED lighting, and fresh quartz countertops or backsplash tile—without moving plumbing or triggering lengthy permit delays.

Planning a Kitchen Remodel in Palm Beach County?

Talk directly with Pillar 22's licensed kitchen team (CBC1268572 / CCC1337493) for an itemized, in-home quote.

Call now Get a quote